Background image

Case Studies

Babraham Park and Ride

Client

Cambridgeshire County Council and Bouygues E&S Solutions Ltd.

Location

Cambridge

Duration

Ongoing

Prospus Group was appointed to secure planning consent for a 2.5MW solar canopy and battery storage project. As part of our undertaking, we advised on the planning strategy for the canopy scheme and the connection route. We also conducted an EIA screening request and commissioned specialist reports on heritage, ecology, flood risk, acoustics, and landscape and visual impact. Finally, the Prospus team managed the Regulation 3 submission for the project.

Download full case study
Progress at Cleator

Cleator Moor - 10MW Battery Storage Project

Client

Low Carbon Storage Investment Company Ltd.

Location

Cleator Moor, Cumbria

Duration

12 months

A 10MW battery system providing services to help balance the national grid using its high-speed response times to the electrical grid network.

Find out more about this project on Low Carbon’s website here.

Download full case study
Skegness Solar PV 2

Skegness Solar PV Farm - 5MW Solar PV Array

Client

Low Carbon Storage Investment Company Ltd.

Location

Skegness, Lincolnshire

Duration

18 months

A 5MW solar PV array 2km to the west of the seaside town of Skegness, Lincolnshire. The 32acre scheme generates enough clean energy from the sun to power more than 1,550 homes.

Download full case study
Bowman Brampton

Brampton 4MW Generator

Client

Messrs Bowman

Location

Brampton, Cumbria

Duration

12 months

Prospus Energy were approached to secure consent for a 4MW diesel generation plant and wayleaves to run the cable back to the point of connection on the electrical grid.

Download full case study