Case Studies

Community Low Carbon Heat Project

Client

Chipping Community Energy Working Group

Location

Chipping, Lancashire

Duration

Ongoing

Prospus Energy is advising on the development of a community owned low carbon energy project for the community of Chipping in Lancashire.

The project will help residents transition away from fossil fuels, tackling both climate change challenges and rising energy costs. Our innovative solution involves capturing heat at ground source in localised shared cluster energy networks which will operate at ground (ambient) temperature.

Download full case study

Kirkby Stephen Low Carbon Heat Network

Client

eQuality Homes Cooperative Group Ltd

Location

Kirkby Stephen, Cumbria

Duration

Ongoing

Prospus Group was appointed to undertake a feasibility study funded by the Rural Community Energy Fund (RCEF), for a low carbon heating system for a 22-development housing scheme in Kirkby Stephen, Cumbria.

As part of the feasibility study the Prospus team assessed the forecast energy loads for the new homes using a range of design tools and local weather data to determine accurate energy loads every 10 minutes throughout the year.

Download full case study
south korea motorsport

South Korea Motorsport

Client

Apex Circuit Design

Location

South Korea

Duration

Ongoing

Revolution Architecture, in collaboration with Apex Circuit Design, has delivered the masterplan for a new motorsport facility in South Korea. The project consists of a motocross circuit and full-sized kart circuit. New buildings proposed include a welcome centre, kart centre building, grandstands, and other temporary structures to accommodate the racing. Revolution Architecture designed the concepts for all the buildings and contributed to the overall site master plan layout.

North Angle Solar Farm

Client

Cambridgeshire County Council and Bouygues E&S Solutions Ltd.

Location

Soham, Cambridgeshire

Duration

Ongoing

Prospus was appointed to provide a planning and project management service for the 39MW North Angle Solar Farm. The size of the scheme and the proximity to the towns of Soham and Wicken created a number of consenting challenges which we were delighted to have managed for our clients – and all whilst managing the restrictions imposed on us from the Covid-19 lockdown.

Download full case study
the white house

The White House

Client

GIVe Properties

Location

Cotswolds UK

Duration

Complete

Our Planning and Architecture teams designed and obtained planning permission within a short period of time for a new accommodation annex and gym at an existing large holiday rental property in the Cotswolds. The new annex comprises an oak framed, natural stone and rendered building providing two new en-suite double bedrooms, specifically designed to accommodate accessible users. The new gym incorporates a treatment room, sauna, and exercise area from an extended and converted existing double garage.

Solar Farm and Battery Energy Storage System, Stanground

Client

Cambridgeshire County Council and Bouygues E&S Solutions Ltd.

Location

Stanground, Peterborough

Duration

Ongoing

Prospus Group was appointed to advise on the consenting strategy for a solar PV and battery storage project on an old landfill site in Peterborough. Our Energy team project managed and submitted the project application and all supporting reports and handled any matters that arose during its consideration by the Local Planning Authority.

Download full case study

Nyiregyhaza Motorsport

Client

Apex Circuit Design

Location

Nyiregyhaza, Hungary

Duration

Ongoing

We worked with Apex Circuit Design and AECOM to deliver the masterplan for a new motorsport facility in Hungary. For this first stage of the project, our team developed the site masterplan and designed all the buildings. Motorsport related buildings include the pits and paddocks for the two main circuits, a karting building, grandstands, a medical centre, private vehicle storage garages and apartments, together with a driver training facility. The hospitality area buildings include a welcome centre, hotel, retail plaza, and an external event amphitheatre for concerts.

Swaffham Prior Community Heat Network

Client

Bouygues E&S Solutions Ltd. for SPCHN (Cambridgeshire County Council)

Location

Swaffham Prior, Cambridgeshire

Duration

12 months

Prospus Group was appointed to provide planning and project management for the application process of this Community Heat Network. This project is a highly ambitious community-led zero carbon heat network proposal that seeks to marry ground-sourced borehole thermal energy with air source powered by a dedicated PV array.

Download full case study

New Holiday Rental Property

Client

Private Client

Location

The Isle of Coll, Scotland

Duration

Ongoing

Our team has designed a new off-grid house on a remote island off the coast of West Scotland. Iron and Pine Ltd. will manufacture the home in their factory using shipping containers for the structure.  These will then be delivered to the island using the ferry from the mainland.

KINGMOOR animation still images 17012019 Photo 2

ModVillage at Kingmoor Park

Client

Kingmoor Park Properties Ltd.

Location

Carlisle, Cumbria

Duration

12 months

Prospus Group identified an opportunity to utilise vacant land at Kingmoor Park Enterprise Zone in Carlisle to develop a modular business village built from shipping containers – the first of its kind in Cumbria. A stunning development encompassing floor-to-ceiling windows, landscaped communal gardens, roof terraces, and a café; ModVillage is set to be the number one business destination in Carlisle.

Download full case study

Babraham Park and Ride

Client

Cambridgeshire County Council and Bouygues E&S Solutions Ltd.

Location

Cambridge

Duration

Ongoing

Prospus Group was appointed to secure planning consent for a 2.5MW solar canopy and battery storage project. As part of our undertaking, we advised on the planning strategy for the canopy scheme and the connection route. We also conducted an EIA screening request and commissioned specialist reports on heritage, ecology, flood risk, acoustics, and landscape and visual impact. Finally, the Prospus team managed the Regulation 3 submission for the project.

Download full case study
Spar

Kirkby Stephen Spar and Filling Station

Client

James Hall and Company Ltd.

Location

Kirkby Stephen, Cumbria

Duration

April 2016 - Nov 2018

Prospus Group were engaged by client, James Hall and Co. to apply for planning permission to build a new Spar store, with consent for long opening hours, on the site of an existing petrol station. The proposal was met with support from the local community who felt the addition of the Spar would be of great benefit to the local area.

Download full case study
Progress at Cleator

Cleator Moor - 10MW Battery Storage Project

Client

Low Carbon Storage Investment Company Ltd.

Location

Cleator Moor, Cumbria

Duration

12 months

A 10MW battery system providing services to help balance the national grid using its high-speed response times to the electrical grid network.

Find out more about this project on Low Carbon’s website here.

Download full case study
Alpine Club

Alpine Club Headquarters Refurbishment and Extension

Client

Alpine Club

Location

Shoreditch, London

Duration

18 months

The Alpine Club was looking to develop a two-storey roof extension and make some internal alterations. The club itself is the oldest mountaineering and Alpine Club in the world, boasting the largest collection of Alpine and Himalayan artefacts.

Download full case study
Bowman Brampton

Brampton 4MW Generator

Client

Messrs Bowman

Location

Brampton, Cumbria

Duration

12 months

Prospus Energy were approached to secure consent for a 4MW diesel generation plant and wayleaves to run the cable back to the point of connection on the electrical grid.

Download full case study
eQuality Homes Concept 4

eQuality Homes - Cooperative Housing Development

Client

eQuality Homes

Location

Kirkby Stephen, Cumbria

Duration

Ongoing

Revolution Architecture are designing the house types for eQuality Homes’ first Cooperative development in Cumbria. These modern, spacious, and efficient homes will be manufactured off-site and delivered onto prepared ground works with final cladding items in local materials used to geographically localise scheme.

The goal is for the houses to be zero carbon in their manufacture and in their use.

Midfield Farm YDNPA

Midfield Farm Extension

Client

Private client

Location

Yorkshire Dales National Park

Duration

18 months

Our client had consulted with Yorkshire Dales National Park on a number of occasions prior to Prospus Consulting being engaged, and had a negative experience of dealing with the Authority.

Prospus lodged an appeal against non-determination – this appeal was successful and planning for our client was approved.

Download full case study
Croft Villas 3

Croft Villas

Client

Private client

Location

Oxfordshire

Duration

9 months

Extension and refurbishment at a private house based in a conservation area. The project consisted of a new green oak framed living area with contrasting dark stained timber boarding and extensive refurbishment works throughout.