Case Studies

ModVillage at Kingmoor Park

Client

Kingmoor Park Properties Ltd.

Location

Carlisle, Cumbria

Duration

12 months

Prospus Group identified an opportunity to utilise vacant land at Kingmoor Park Enterprise Zone in Carlisle to develop a modular business village built from shipping containers – the first of its kind in Cumbria. A stunning development encompassing floor-to-ceiling windows, landscaped communal gardens, roof terraces, and a café; ModVillage is set to be the number one business destination in Carlisle.

Download full case study

Kirkby Stephen Spar and Filling Station

Client

James Hall and Company Ltd.

Location

Kirkby Stephen, Cumbria

Duration

April 2016 - Nov 2018

Prospus Group were engaged by client, James Hall and Co. to apply for planning permission to build a new Spar store, with consent for long opening hours, on the site of an existing petrol station. The proposal was met with support from the local community who felt the addition of the Spar would be of great benefit to the local area.

Download full case study

Cleator Moor - 10MW Battery Storage Project

Client

Low Carbon Storage Investment Company Ltd.

Location

Cleator Moor, Cumbria

Duration

12 months

A 10MW battery system providing services to help balance the national grid using its high-speed response times to the electrical grid network.

Find out more about this project on Low Carbon’s website here.

Download full case study

Alpine Club Headquarters Refurbishment and Extension

Client

Alpine Club

Location

Shoreditch, London

Duration

18 months

The Alpine Club was looking to develop a two-storey roof extension and make some internal alterations. The club itself is the oldest mountaineering and Alpine Club in the world, boasting the largest collection of Alpine and Himalayan artefacts.

Download full case study

Skegness Solar PV Farm - 5MW Solar PV Array

Client

Low Carbon Storage Investment Company Ltd.

Location

Skegness, Lincolnshire

Duration

18 months

A 5MW solar PV array 2km to the west of the seaside town of Skegness, Lincolnshire. The 32acre scheme generates enough clean energy from the sun to power more than 1,550 homes.

Download full case study

Brampton 4MW Generator

Client

Messrs Bowman

Location

Brampton, Cumbria

Duration

12 months

Prospus Energy were approached to secure consent for a 4MW diesel generation plant and wayleaves to run the cable back to the point of connection on the electrical grid.

Download full case study

eQuality Homes - Cooperative Housing Development

Client

eQuality Homes

Location

Kirkby Stephen, Cumbria

Duration

Ongoing

Revolution Architecture are designing the house types for eQuality Homes’ first Cooperative development in Cumbria. These modern, spacious, and efficient homes will be manufactured off-site and delivered onto prepared ground works with final cladding items in local materials used to geographically localise scheme.

The goal is for the houses to be zero carbon in their manufacture and in their use.

Midfield Farm Extension

Client

Private client

Location

Yorkshire Dales National Park

Duration

18 months

Our client had consulted with Yorkshire Dales National Park on a number of occasions prior to Prospus Consulting being engaged, and had a negative experience of dealing with the Authority.

Prospus lodged an appeal against non-determination – this appeal was successful and planning for our client was approved.

Download full case study

Croft Villas

Client

Private client

Location

Oxfordshire

Duration

9 months

Extension and refurbishment at a private house based in a conservation area. The project consisted of a new green oak framed living area with contrasting dark stained timber boarding and extensive refurbishment works throughout.