Case Studies

Swaffham Prior Community Heat Network

Client

Bouygues E&S Solutions Ltd. for SPCHN (Cambridgeshire County Council)

Location

Swaffham Prior, Cambridgeshire

Duration

12 months

Prospus Group was appointed to provide planning and project management for the application process of this Community Heat Network. This project is a highly ambitious community-led zero carbon heat network proposal that seeks to marry ground-sourced borehole thermal energy with air source powered by a dedicated PV array.

Download full case study
KINGMOOR animation still images 17012019 Photo 2

ModVillage at Kingmoor Park

Client

Kingmoor Park Properties Ltd.

Location

Carlisle, Cumbria

Duration

12 months

Prospus Group identified an opportunity to utilise vacant land at Kingmoor Park Enterprise Zone in Carlisle to develop a modular business village built from shipping containers – the first of its kind in Cumbria. A stunning development encompassing floor-to-ceiling windows, landscaped communal gardens, roof terraces, and a café; ModVillage is set to be the number one business destination in Carlisle.

Download full case study
Spar

Kirkby Stephen Spar and Filling Station

Client

James Hall and Company Ltd.

Location

Kirkby Stephen, Cumbria

Duration

April 2016 - Nov 2018

Prospus Group were engaged by client, James Hall and Co. to apply for planning permission to build a new Spar store, with consent for long opening hours, on the site of an existing petrol station. The proposal was met with support from the local community who felt the addition of the Spar would be of great benefit to the local area.

Download full case study
Alpine Club

Alpine Club Headquarters Refurbishment and Extension

Client

Alpine Club

Location

Shoreditch, London

Duration

18 months

The Alpine Club was looking to develop a two-storey roof extension and make some internal alterations. The club itself is the oldest mountaineering and Alpine Club in the world, boasting the largest collection of Alpine and Himalayan artefacts.

Download full case study
Midfield Farm YDNPA

Midfield Farm Extension

Client

Private client

Location

Yorkshire Dales National Park

Duration

18 months

Our client had consulted with Yorkshire Dales National Park on a number of occasions prior to Prospus Consulting being engaged, and had a negative experience of dealing with the Authority.

Prospus lodged an appeal against non-determination – this appeal was successful and planning for our client was approved.

Download full case study